Utaba Dam Rehabilitation Plan-EA
The project is funded through authority of the Watershed Protection and Flood Prevention Act.
Public Notice of Availability
The U.S. Department of Agriculture’s Natural Resources Conservation Service (NRCS), in coordination with Weber County, announce the availability of the Final Watershed Plan and Environmental Assessment (Plan-EA) for the Utaba Dam Rehabilitation Project (Project) in Weber County, Utah. This Project is partially funded through the Watershed Protection and Flood Prevention Act (Public Law [PL] 83-566).
Project Description
The Project would upgrade Utaba Dam to meet Utah State and NRCS Dam Safety standards while maintaining water detention capacity. The dam would be raised 4 feet to provide additional freeboard for the Probable Maximum Flood event. The undersized and degraded principal spillway would be replaced, and the auxiliary spillway would be relocated to the left abutment. A downstream filter and drain system would address seepage issues, and a new principal spillway would prevent blockages from beaver activity while allowing full reservoir drainage. A chimney and blanket filter system would be installed to prevent soil migration. Sediment management measures include removing accumulated sediment and reducing sediment buildup by upgrading the principal spillway. A control gate on the principal spillway would allow water release to be restricted, enabling the reservoir to serve as a wildfire suppression resource as well as facilitate inspection of the principal spillway conduit.
NEPA Analysis
NRCS, as the lead federal agency, has prepared a Final Plan-EA that analyzes potential Project impacts to the natural and human environment, in accordance with the National Environmental Policy Act (NEPA). The Final Plan-EA also integrates analysis following the Principles, Requirements and Guidelines for Water and Land Related Resources Implementation Studies and Federal Water Resource Investments (PR&G, 2018). The Draft Plan-EA was reviewed by NRCS-Utah, the National Water Management Center, and NRCS-National Headquarters. The Draft Plan-EA was available for public comment between April 20, 2026 and May 20, 2026.
Current Status
NRCS is accepting comments on the Draft Watershed Plan-EA between April 20, 2026 and May 20, 2026. A public meeting for the Project will be held on May 5, 2026—see information below.
Project Documents
Final Plan-EA
Final Appendix A
Final Appendix B
Final Appendix C
Final Appendix D
Final Appendix E
FONSI
Notice of Availability
Contact Information
Ammon Boswell, Watershed Program Manager