DRAFT WATERSHED PLAN - ENVIRONMENTAL IMPACT STATEMENT (EIS) SHORTFOOT CREEK WATERSHED, SITE 7
The purposes of the proposed action are flood damage reduction and watershed protection.
Shortfoot Creek watershed is a part of the Wild Rice River basin and the Red River Basin which have histories of spring snow melt and seasonal rains resulting in frequent overland and overbank flooding, resulting in recurring damages. The flooding causes disruptions to transportation by overtopping and washing out roads, and damaging bridges and culverts. This flooding also inundates an average of 2,189 acres annually which results in high transportation of nutrients to the Wild Rice River due to upland and channel erosion, flushing nutrients, crop losses, and delayed planting. The Shortfoot Creek watershed annually contributes 15,548 pounds of phosphorus and 70,176 pounds of nitrogen to the Wild Rice River and ultimately the Red River, for which U.S. agreed to nutrient objectives at the international border have not been achieved. Dissolved inorganic phosphorus is of particular concern, given that annual loads and concentrations have been on an upward trend since the early 1980s.
The proposed action includes the construction of a multi-purpose dry dam with incorporated features to reduce nutrient delivery from the upstream watershed; reduce the extents, frequency, and duration of downstream cropland flooding to further reduce nutrient transport to the river; and to restore, enhance and create wetland and upland wildlife habitat. Shortfoot Creek Site 7 will entail construction of a 6,100-foot earthen embankment dam and associated spillways. Within the interior of the dry dam, the project will develop 130 acres of shallow water biomass harvest areas managed to optimize nutrient removal. A 2.64 mile stretch of Shortfoot Creek will be restored to its original path, resulting in maintaining or restoring 230.5 acres of wetlands and 101.5 acres of uplands managed for wildlife habitat.
Current Status
A public scoping meeting was held on March 27, 2025, in Forman, ND for the Shortfoot Creek Watershed Plan sponsored by the Sargent Count Water Resources District. A Notice of Intent to prepare an EIS was published to the the Federal Register on June 25, 2025. Stakeholder comments were accepted up until August 11, 2025. The Draft Watershed Plan and EIS are currently being drafted and will include stakeholder input. Section 106 Consultation was completed on 3/6/2026.