Green River/Tusher Diversion Dam Rehabilitation -- Archived Material

Project Description

The NRCS and UDAF are analyzing alternatives to rehabilitate damage to the Green River diversion dam from the late 2010 and early 2011 flood events. The diversion dam was constructed in the early 1900’s and has been modified over the years to maintain the dam. During the 2010/2011 flood events, flows in the Green River caused severe damage to the diversion dam compromising its structural integrity. If the dam fails, water supply to two irrigation canals, a historic irrigation water wheel delivery system, and one hydropower plant would be eliminated.
 

Project Documents

Draft EIS

Green River Diversion Rehabilitation Draft EIS Comment Period Public Notice
Green River Diversion Rehabilitation Draft EIS Comment Period Agency and Landowner Notice
Green River Diversion Rehabilitation Draft EIS -Total
Green River Diversion Rehabilitation Draft EIS-Report
Green River Diversion Rehabilitation Draft EIS-App A
Green River Diversion Rehabilitation Draft EIS-App B
Green River Diversion Rehabilitation Draft EIS-App C
Green River Diversion Rehabilitation Draft EIS-App D

1st Scoping

Scoping Notice (PDF, 123 KB)
Scoping Project Description (PDF, 1 MB)
Scoping Public Meeting Presentation (PDF, 2 MB)
Scoping Report (PDF, 3 MB)

2nd Scoping

2nd Scoping Report (PDF, 8 MB)
2nd Scoping Notice (PDF, 124 KB)
2nd Scoping Federal Register EIS Notice of Intent (PDF, 203KB)
2nd Scoping Telebriefing Presentation (PDF, 1.96MB)
2nd Scoping Telebriefing Presentation Recording 2PM Presentation (MP3, 2.31MB)
2nd Scoping Telebriefing Presentation Recording 6PM Presentation (MP3, 2.24MB)