Looking for cost lists, ranking criteria or application deadlines from a past year? Find it here. For more info, contact the NRCS Oregon Programs Team at 503-414-3235.
2017 EQIP Program Information
2017 Sign Up Deadlines: 11/18/2017; 2/17/2017; and 5/19/2017 for all EQIP sign-ups, 7/21/2017 for only the Salmon Superhwy Project in Tillamook County.
2016 Sign Up Deadlines: 1/15/2016 and 4/15/2016 for all general EQIP sign-ups with the exception of a third deadline of 6/17/2016 for these 3 funding pools: 1) Champoeg Watershed – Marion County 2) Soil Health – Clackamas/Multnomah Counties and 3) Tualatin Valley Irrigation Efficiency – Washington County. Additional EQIP funding pools for wildfire rehabilitation were established for burned areas in Wasco County (deadline 8/12/2016); Baker, Grant and Malheur County (deadline 10/16/2016); Douglas County (deadline 11/20/2016) and Wallowa County (11/27/2016). A drought funding pool was available to Baker, Crook, Grant, Malheur, Union, Umatilla, Wallowa, Gilliam, Marion, Morrow, and Wheeler counties with a sign up deadline of 6/17/2016. The Greater La Pine Basin Joint Chiefs Project was new in 2016 and offered a different sign up deadline of 5/20/2016.