Number |
Project Name |
|
Number |
Project Name |
BA-27c |
Barataria Basin Landbridge Shoreline Protection, Phase 3 |
|
CS-21 |
Highway 384 Hydrologic Restoration |
BA-27d |
Barataria Basin Landbridge Shoreline Protection, Phase 4 |
|
CS-31 |
Holly Beach Sand Management |
BA-27 |
Barataria Basin Landbridge Shoreline Protection, Phases 1 and 2 |
|
ME-11 |
Humble Canal Hydrologic Restoration |
BA-26 |
Barataria Bay Waterway East Side Shoreline Protection |
|
BA-20 |
Jonathan Davis Wetland Restoration |
BA-23 |
Barataria Bay Waterway West Side Shoreline Protection |
|
TV-17 |
Lake Portage Land Bridge |
TV-20 |
Bayou Sale Shoreline Protection |
|
ME-17 |
Little Pecan Bayou Hydrologic Restoration |
CS-29 |
Black Bayou Culverts Hydrologic Restoration |
|
BA-03c |
Naomi Outfall Management |
TV-09 |
Boston Canal/Vermilion Bay Bank Protection |
|
TV-13a |
Oaks/Avery Canal Hydrologic Restoration, Increment 1 |
TE-28 |
Brady Canal Hydrologic Restoration |
|
TE-34 |
Penchant Basin Natural Resources Plan, Increment 1 |
CS-09 |
Brown Lake Hydrologic Restoration |
|
CS-24 |
Perry Ridge Shore Protection |
BS-03a |
Caernarvon Diversion Outfall Management |
|
CS-25 |
Plowed Terraces Demonstration |
CS-04a |
Cameron-Creole Maintenance |
|
TE-29 |
Raccoon Island Breakwaters Demonstration |
TV-16 |
Cheniere Au Tigre Sediment Trapping Demonstration |
|
TE-48 |
Raccoon Island Shoreline Protection/Marsh Creation |
LA-03b |
Coastwide Nutria Control Program |
|
LA-09 |
Sediment Containment System for Marsh Creation Demonstration |
TV-04 |
Cote Blanche Hydrologic Restoration |
|
TE-39 |
South Lake De Cade Freshwater Introduction |
CS-20 |
East Mud Lake Marsh Management |
|
BA-41 |
South Shore of The Pen Shoreline Protection and Marsh Creation |
TE-17 |
Falgout Canal Planting Demonstration |
|
CS-11b |
Sweet Lake/Willow Lake Hydrologic Restoration |
LA-05 |
Floating Marsh Creation Demonstration |
|
TE-36 |
Thin Mat Floating Marsh Enhancement Demonstration |
ME-13 |
Freshwater Bayou Bank Stabilization |
|
TE-18 |
Timbalier Island Planting Demonstration |
ME-04 |
Freshwater Bayou Wetland Protection |
|
CS-19 |
West Hackberry Vegetative Planting Demonstration |
PO-06 |
Fritchie Marsh Restoration |
|
BA-47 |
West Pointe a la Hache Marsh Creation |
BA-02 |
GIWW (Gulf Intracoastal Waterway) to Clovelly Hydrologic Restoration |
|
BA-04c |
West Pointe a la Hache Outfall Management |
CS-30 |
GIWW - Perry Ridge West Bank Stabilization |
|
BS-12 |
White Ditch Resurrection and Outfall Management |
TE-43 |
GIWW Bank Restoration of Critical Areas in Terrebonne |
|
LA-16 |
Non-Rock Alternatives to Shoreline Protection Demonstration |
CS-49 |
Cameron-Creole Freshwater Introduction |
|
TE-66 |
Central Terrebonne Freshwater Enhancement |
PO-34 |
Alligator Bend Marsh Restoration and Shore Protection |
|
ME-31 |
Freshwater Bayou Marsh Creation |
TV-21 |
East Marsh Island Marsh Creation |
|
PO-75 |
LaBranche East Marsh Creation |
LA-39 |
Coastwide Vegetative Plantings |
|
CS-53 |
Kelso Bayou Marsh Creation |
PO-133 |
LaBranche Central Marsh Creation |
|
TE-112 |
North Catfish Lake Marsh Creation |