Skip to main content

San Joaquin Feral Swine Eradication and Control Pilot Program Project

The Feral Swine Eradication and Control Pilot Program responds to the threat feral swine pose to American agriculture, landscapes and human and livestock health.

 

Project Area

The area of coverage is the entirety of the San Joaquin National Wildlife Refuge as occurring in Stanislaus County (~11,800 acres). Private lands include approximately 22,800 acres, or about 34,600 acres total.

Map(s) 

Map of California showing Henry Coe State Park as occurring in Santa Clara County, California
Map of California showing coverage of the entire contiguity of Pismo Beach State Park, Pismo Dunes National Preserve, Oceano Dunes State Vehicular Recreation Area as occurring in San Luis Obispo County, and the Guadalupe-Nipomo Dunes National Wildlife Refuge as occurring in San Luis Obispo and Santa Barbara Counties

Anticipated Partner Activities

The partner would collaborate closely with Animal and Plant Health Inspection Service (APHIS) project area staff, local Natural Resources Conservation Service (NRCS) field offices, and other partners such as ag producer groups, farm advisors, and Non-Government Organizations to affect the target outcome of swine eradication. Most critically, providing support for APHIS consistent field monitoring, trap baiting procedures, and coordinated data management with APHIS as the lead agency. In addition, the partner would be responsible for training landowners and conducting educational events regarding the benefits of their engagement in implementing the project, including opportunities for restoration work on private lands through Farm Bill programs. This approach maximizes ag producer engagement through familiar mechanisms.

APHIS will be considered the subject matter experts for implementing feral swine removal and damage reduction activities. Partners will need to collaborate with APHIS personnel when removal activities are requested by participating landowners. All projects will be a collaborative and coordinated effort between the selected partner, NRCS, and APHIS. It is required that APHIS maintains operational control of feral swine management activities.

Monitoring/Evaluation Requirements of Partner

For this project, partners are expected to monitor project progress both before and after feral swine removal.

Partners are required to collect standardized information for trapping operations in accordance with APHIS procedures. Examples of data collected include trap location, number of pigs trapped, location of nearby resources, etc.

Training Expectations

Education will be essential aspects of the project to ensure landowners are educated on the need for removing feral swine, approved techniques, and methods for controlling feral swine populations. Partners are expected to assist with training and educational activities.

Back to Feral Swine Eradication and Control Pilot Program