Skip Navigation

Seasonal High Tunnel Initiative

NRCS has established a Seasonal High Tunnel Initiative for FY 2015. Agricultural producers can apply to receive financial and technical assistance.  High tunnels allow participants to extend the growing season, increase crop yields, conserve water, reduce pesticide use, and maintain vital soil nutrients.  Funding is offered under both the Agricultural Management Assistance Program (AMA) and the Environmental Quality Incentives Program (EQIP).

The application deadline for FY 2015 funding through the AMA program is May 1, 2015.

The application deadline for FY 2015 funding through the EQIP program is December 19, 2014.

Download this information in a printable fact sheet. The following document requires Acrobat Reader.

Rhode Island High Tunnel Initiative Overview (PDF, 354 KB)

AMA Seasonal High Tunnel Ranking Tool (PDF, 77 KB)
AMA Cost List (PDF, 201 KB)

EQIP Seasonal High Tunnel Ranking Tool (PDF, 82 KB)
EQIP Cost List (PDF, 178 KB)

What is a high tunnel?

Farmers in Hoop HouseHigh tunnels (also known as hoop houses) are structures that modify the growing climate, allowing for tender, sensitive, and specialty crops like certain varieties of vegetables, herbs, berries, and others to grow where they otherwise may not.  High tunnels are constructed of metal bow frames with wood framed ends, at least six feet in height, and are covered with one or two layers of polyethylene.

View informational videos on the USDA-NRCS high tunnels/hoop houses.

USDA High Tunnel/Hoop Houses with NRCS Chief and Deputy Secretary Merrigan

USDA Promotes Hoop Houses at White House Garden Event

Why high tunnels?

High tunnels can lengthen the timeframe for local marketing of produce, which increases sustainability while lowering energy and transportation inputs.

An extended growing season and steady income may offer advantages to small, limited resource, and organic farmers. They can also assist producers transitioning to specialty crops.

What will AMA and EQIP pay for?

NRCS provides financial assistance for high tunnels through the AMA and EQIP programs.

Plants must be planted in the ground or in permanent raised beds, not containerized.

Since water runoff from high tunnels can cause erosion, pooling, and other environmental concerns, additional conservation practices may be installed as a condition for the installation of a high tunnel. These include:

  • runoff management
  • filter strips
  • drain structures for water control
  • critical area planting
  • Additional practices that might be considered as part of your conservation plan include nutrient management and integrated pest management, cover crop, and conservation crop rotation.

    What are the practice payment rates for high tunnels?

    NRCS provides financial compensation for part of the cost of establishing and maintaining conservation practices that improve the natural resources on your land.  Financial assistance payments are provided to eligible producers based on a portion of the average cost associated with practice implementation.  Historically underserved producers (limited resource farmers/ranchers, beginning farmers/ranchers, socially disadvantaged producers, Tribes) may be eligible for a higher practice payment rate for the implementation for conservation practices and conservation plans.

    FY 2015 Practice Payment Rates

    The following documents provide a listing of all eligible FY 2015 EQIP high tunnel practices and their payment rates.

    The following document requires Acrobat Reader.

    AMA Cost List (PDF, 201 KB)

    EQIP Cost List (PDF, 178 KB)

    Who can apply?

    To qualify for the Seasonal High Tunnel Initiative, you must:

  • Be an agricultural producer.
  • Install the high tunnel on existing cultivated land.
  • Other considerations

    The land must currently be in agricultural production.

    Approved applicants will receive financial assistance for a high tunnel and related additional conservation practices that help achieve the expected conservation benefits or mitigate any potential negative effects from installing the high tunnel.

    The high tunnel must be purchased as a manufactured kit from an NRCS list of approved vendors, be at least six feet high, and have an expected lifespan of at least four years.

    Electrical, heating or ventilation systems may be added to the high tunnel at the applicant’s own expense.

    Participating growers must help evaluate the effects of high tunnels on natural resources. You must complete a short questionnaire annually about nutrients and pesticides used, crop yields, and crop season dates.

    How do I apply?

    Contact local NRCS field office to speak to one of our conservation professionals to begin the program application process.
    Information and application forms are available on our Web site.

    Agricultural Management Assistance Program (AMA) Application Materials

    Environmental Quality Incentives Program (EQIP) Application Materials 

    When should I apply?

    Applications are accepted on a continuous basis throughout the year.  There are cut-off deadlines for the FY 2015 funding which vary by program.  

    The application deadline for FY 2015 funding through the AMA program is May 1, 2015.

    The application deadline for FY 2015 funding through the EQIP program is December 19, 2014.