|
Conservation Practice Name (Units) (Code) (Date Issued) |
Practice
Standard
|
Job Sheet |
Statement of Work
|
|
Access Control (Ac.) (472) (February 2011) |
|
 |
 |
|
Access Road (Ft.) (560) (October 2010) |
 |
|
 |
|
Agrichemical Handling Facility (No.) (309) (March 2011) |
 |
|
 |
|
Air Filtration and Scrubbing (No.) (371) (July 2010) |
|
|
 |
|
Amendments for Treatment of Agricultural Waste (AU) (591) (July 2005) |
 |
|
 |
|
Anaerobic Digester (No.) (366) (July 2010) |
|
|
 |
|
Animal Mortality Facility (No.) (316) (February 2011) |
 |
|
 |
|
Animal Trails and Walkways (Ft.) (575) (May 2011) |
 |
|
 |
|
Bedding (Ac.) (310) (October 2010) |
 |
|
 |
|
Brush Management (Ac.) (314) (February 2011) |
 |
 |
|
|
Channel Bed Stabilization (Ft.) (584) (February 2011) |
 |
|
 |
|
Clearing and Snagging (Ft.) (326) (February 2011) |
|
|
 |
|
Combustion System Improvement (No.) (372) (July 2010) |
 |
|
 |
|
Composting Facility (No.) (317) (April 2011) |
 |
|
 |
|
Conservation Cover (Ac.) (327) (March 2011) |
 |


(Native Seeding Calculator) |
 |
|
Conservation Crop Rotation (Ac.) (328) (September 2011) |
 |
 |
 |
|
Constructed Wetland (Ac.) (656) (July 2011) |
 |
|
 |
|
Contour Buffer Strips (Ac.) (332) (April 2011) |
 |
 |
 |
|
Contour Farming (Ac.) (330) (May 2005) |
 |
 |
 |
|
Cover Crop (Ac.) (340) (September 2011) |
 |
 |
 |
|
Critical Area Planting (Ac.) (342) (September 2011) |
 |
 |
 |
|
Cross Wind Trap Strips (Ac.) (589) (March 2007) |
 |
|
 |
|
Dam (No. and Ac-Ft.) (402) (December 2011) |
 |
|
 |
|
Dam, Diversion (No. or Ft.) (348) (December 2011) |
 |
|
 |
|
Denitrifying Bioreactor (Ac.) (Interim Code 747) |
 |
|
 |
|
Dike (Ft.) (356) (March 2008) |
 |
|
 |
|
Diversion (Ft.) (362) (September 2010) |
 |
|
 |
|
Drainage Water Management (Ac.) (554) (July 2010) |
 |
 |
 |
|
Dry Hydrant (No.) (432) (January 2012) |
 |
|
 |
|
Dust Control from Activity on Open Lot Surfaces (Ac.) (375) (February 2011) |
 |
|
 |
|
Early Successional Habitat Development/Management (Ac.) (647) (April 2002) |
 |
|
 |
|
Farmstead Energy Improvement (No.) (374) (August 2011) |
 |
|
 |
|
Feed Management (No. of Systems and AUs Affected) (592) (August 2007) |
 |
|
 |
|
Fence (Ft.) (382) (April 2011) |
 |
Barbed and Woven Wire
Electric |
 |
|
Field Border (Ft.) (386) (March 2007) |
 |
 |
 |
|
Filter Strip (Ac.) (393) (February 2010) |
 |

(Design Sheet) |
 |
|
Firebreak (Ft.) (394) (February 2011) |
 |
 |
 |
|
Fishpond Management (Ac.) (399) (January 2002) |
 |
|
 |
|
Forage and Biomass Planting (Ac.) (512) (February 2011) |
 |
|
 |
|
Forage Harvest Management (Ac.) (511) (August 2009) |
 |
 |
 |
|
Forest Stand Improvement (Ac.) (666) (February 2002) |
 |
|
 |
|
Grade Stabilization Structure (No.) (410) (January 2012) |
 |
|
 |
|
Grassed Waterway (Ac.) (412) (July 2010) |
 |
 |
 |
|
Heavy Use Area Protection (Ac.) (561) (October 2010) |
 |
|
 |
|
Hedgerow Planting (Ft.) (422) (August 2007) |
 |
|
|
|
Herbaceous Weed Control (Ac.) (315) (February 2011) |
 |
 |
 |
|
Integrated Pest Management (IPM) (Ac.) (595) (February 2011) |
 |
 |
 |
|
Irrigation Ditch Lining (Ft.) (428) (October 2010) |
 |
|
 |
|
Irrigation Land Leveling (Ac.) (464) (October 2012) |
 |
|
 |
|
Irrigation Pipeline (Ft.) (430) (October 2010) |
 |
|
 |
|
Irrigation Reservoir (Ac.-Ft.) (436) (January 2012) |
 |
|
 |
|
Irrigation System, Microirrigation (Ac.) (441) (January 2012) |
 |
|
 |
|
Irrigation System, Sprinkler (No. and Ac.) (442) (January 2012) |
 |
|
 |
|
Irrigation Water Management (Ac.) (449) (January 2012) |
 |
|
 |
|
Karst Sinkhole Treatment (No.) (527) (April 2011) |
 |
|
 |
|
Land Clearing (Ac.) (460) (January 2012) |
 |
|
 |
|
Land Smoothing (Ac.) (466) (March 2008) |
 |
|
 |
|
Lined Waterway or Outlet (Ft.) (468) (February 2011) |
 |
|
 |
|
Livestock Pipeline (Ft.) (516) (January 2012) |
 |
|
 |
|
Monitoring and Evaluation (No.) (799) (August 2011) |
 |
|
|
|
Monitoring Well (No.) (353) (April 2011) |
 |
|
 |
|
Mulching (Ac.) (484) (September 2011) |
 |
 |
 |
|
Nutrient Management (Ac.) (590) (December 2008) |
 |
|
 |
|
Obstruction Removal (Ac.) (500) (October 2010) |
 |
|
 |
|
Open Channel (Ft.) (582) (November 2012) |
 |
|
 |
|
Pond (No.) (378) (February 2012) |
 |
|
 |
|
Pond Sealing or Lining, Bentonite Sealant (No.) (521C) (August 2011) |
 |
|
 |
|
Pond Sealing or Lining, Compacted Clay (No.) (521D) (August 2011) |
 |
|
 |
|
Pond Sealing or Lining, Flexible Membrane (No.) (521A) (January 2012) |
 |
|
 |
|
Pond Sealing or Lining, Soil Dispersant (No.) (521B) (August 2011) |
 |
|
 |
|
Precision Land Forming (Ac.) (462) (March 2010) |
 |
|
 |
|
Prescribed Burning (Ac.) (338) (January 2010) |
 |
 |
 |
|
Prescribed Forestry (Ac.) (409) (August 2007) |
 |
|
|
|
Prescribed Grazing (Ac.) (528) (February 2008) |
 |
|
 |
|
Pumping Plant (No.) (533) (January 2012) |
 |
|
 |
|
Recreation Land Grading and Shaping (Ac.) (566) (March 2008) |
 |
|
 |
|
Residue and Tillage Management, Mulch Till (Ac.) (345) (September 2011) |
 |
 |
 |
|
Residue and Tillage Management, No-Till/Strip Till/Direct Seed (Ac.) (329) (September 2011) |
 |
 |
 |
|
Residue and Tillage Management, Ridge Till (Ac.) (346) (September 2011) |
 |
 |
 |
|
Residue Management, Seasonal (Ac.) (344) (September 2011) |
 |
|
 |
|
Restoration and Management of Rare and Declining Habitats (Ac.) (643) (March 2006) (Specification, PDF, 3 MB) |
 |

(Native Seeding Calculator) |
 |
|
Riparian Forest Buffer (Ac.) (391) (August 2007) |
 |
 |
|
|
Roof Runoff Structure (No.) (558) (October 2012) |
 |
|
 |
|
Roofs and Covers (No.) (367) (April 2011) |
 |
|
 |
|
Seasonal High Tunnel for Crops (No.) (798) (January 2010) |
 |
 |
|
|
Sediment Basin (No.) (350) (March 2008) |
 |
|
 |
|
Shallow Water Development and Management (Ac.) (646) |
|
|
|
|
Solid/Liquid Waste Separation Facility (No.) (632) (April 2008) |
 |
|
|
|
Spoil Spreading (Ac.) (572) (October 2010) |
 |
|
 |
|
Spring Development (No.) (574) (October 2007) |
 |
|
 |
|
Stream Crossing (No.) (578) (April 2012) |
 |
|
 |
|
Stream Habitat Improvement and Management (Ac.) (395) (April 2005) |
 |
|
|
|
Streambank and Shoreline Protection (Ft.) (580) (August 2011) |
 |
|
 |
|
Stripcropping (Ac.) (585) (February 2010) |
 |
 |
 |
|
Structure for Water Control (No.) (587) (July 2010) |
 |
|
 |
|
Subsurface Drain (Ft.) (606) (January 2013) |
 |
|
 |
|
Surface Drain, Field Ditch (Ft.) (607) (July 2010) |
 |
|
 |
|
Surface Drain, Main or Lateral (Ft.) (608) (July 2010) |
 |
|
 |
|
Terrace (Ft.) (600) (April 2008) |
 |
 |
 |
|
Tile Intake Replacement (No.) (IA-980) (April 2008) |
 |
|
 |
|
Trails and Walkways (Ft.) (568) (November 2012) |
 |
|
 |
|
Tree/Shrub Establishment (Ac.) (612) (August 2007) |
 |
|
 |
|
Tree/Site Preparation (No.) (490) (June 2002) |
 |
|
 |
|
Underground Outlet (Ft.) (620) (August 2011) |
 |
|
 |
|
Upland Wildlife Habitat Management (Ac.) (645) (June 2011) |
 |
|
 |
|
Vegetated Subsurface Drain Outlet (Ft.) (739) (July 2012) |
 |
|
 |
|
Vegetated Treatment Area (Ac.) (635) (April 2008) |
 |
|
|
|
Waste Facility Closure (No.) (360) (August 2011) |
 |
|
|
|
Waste Recycling (Ac.) (633) (January 2012) |
 |
|
 |
|
Waste Storage Facility (No.) (313) (October 2007) |
 |
|
 |
|
Waste Transfer (No.) (634) (April 2009) |
 |
|
 |
|
Waste Treatment (No.) (629) (July 2005) |
 |
|
 |
|
Waste Treatment Lagoon (No.) (359) (October 2007) |
 |
|
 |
|
Water and Sediment Control Basin (No.) (638) (July 2010) |
 |
|
 |
|
Water Well (No.) (642) (August 2012) |
 |
|
 |
|
Water Well Decommissioning (No.) (351) (August 2011) |
 |
|
 |
|
Watering Facility (No.) (614) (August 2011) |
 |
|
 |
|
Well Water Testing (No.) (355) (August 2011) |
 |
|
 |
|
Wellhead Protection (Agricultural Drainage Well Cisterns) (No.) (IA-981) (April 2008) |
 |
|
 |
|
Wetland Creation (Ac.) (658) (July 2011) |
 |
|
 |
|
Wetland Enhancement (Ac.) (659) (July 2011) |
 |
|
 |
|
Wetland Restoration (Ac.) (657) (July 2011) |
 |
|
 |
|
Wetland Wildlife Habitat Management (Ac.) (644) (February 2008) |
 |
|
 |
|
Windbreak/Shelterbelt Establishment (Ft.) (380) (August 2007) |
 |
|
 |
|
Windbreak/Shelterbelt Renovation (Ft.) (650) (August 2007) |
 |
|
 |
|
Woody Residue (384) |
|
|
|