This project was an EWP project located on the Arkansas River approximately 40 miles east of Pueblo, CO. and was installed in the winter of FY '2000.  It consisted of the construction of a 257 c.y. concrete diversion structure, a 57 c.y. canal structure,  and approximately 7,500 tons of rock riprap used for streambank protection.  Total cost was approximately $640,000.  This project was designed by members of the Regional Engineering Design staff that was formerly located in the NRCS Casper state office.  The team was responsible for providing assistance to Colorado and Wyoming during its existence. 

Photographs Before Construction

Existing Diversion Washout
Existing Diversion 
Washout

Existing Diversion Washout
Existing Diversion 
Washout

Existing Diversion Washout
Existing Diversion Washout

Existing Canal Trash Rack
Existing Canal Trash
Rack Assembly

Existing Diversion Washout
Existing diversion

Existing Diversion Washout
Existing diversion

Existing Diversion Washout
Existing Diversion 
Washout

Streambank Erosion Upstream of Structure
Upstream bank erosion

 

 

Photographs During Construction

Rebar on Apron of New Diversion
Apron of New Diversion
Structure Next to 
Existing Diversion

Steel Placement on New Concrete Diversion Structure
New Diversion
Structure

Steel Placement on New Concrete Diversion Structure
Apron/Crest of New
 Diversion Structure

Steel Placement on New Concrete Diversion Structure
Apron of New
Diversion Structure

Steel Placement on New Concrete Diversion Structure
Apron of New
Diversion Structure

Steel Placement on New Concrete Diversion Structure
Apron of New
Diversion Structure &
New Canal Structure
Cutoff Walls

Steel Placement on New Concrete Diversion Structure
Apron of New
Diversion Structure

Steel Placement on New Concrete Diversion Structure
Apron of New
Diversion Structure

Steel Placement on New Concrete Canal Structure
Apron and Footings on
New Canal Structure

Steel Placement on New Concrete Diversion Structure
New Canal & Diversion
Structure

Steel Placement on New Concrete Diversion Structure
New Diversion Structure
Cutoff Walls

Cutoff Walls of New Diversion Structure
New Diversion Structure
Cutoff Walls

Steel Placement on New Concrete Canal Structure
New Canal Structure

Steel Placement on New Concrete Canal Structure
New Canal Structure

Steel Placement on New Concrete Canal Structure
New Canal Structure

Steel Placement on New Concrete Diversion and Canal Structure
New Canal & Diversion
Structure

Apron of New Concrete Diversion Structure
Apron of New Diversion
Structure

Concrete Pour on Apron around Floor Block Steel
Concrete Pour on New
Diversion Apron

Apron of New Concrete Diversion Structure
New Diversion Structure

Canal Structure Backfill Operation Against Sidewall
Structural Backfill 
Against New Canal 
Structure

Geotextile and Riprap Placement Along Streambank
Geotextile and Riprap
Placement Upstream of
Structure

Geotextile and Riprap Placement Along Streambank
Upstream Riprap 
Protection Along
Streambank

   

 

Completed Concrete Diversion and Canal Structure
New Diversion Structure

Completed Diversion Structure
New Diversion Structure
with Riprap Protection

Completed Diversion Structure
New Diversion Structure
with Floor Blocks

Completed Canal Structure with Trash Rack
New Canal Structure
with Trash Rack

Canal Structure Catwalk
New Canal Structure

Otero Canal
Otero Canal

Completed Canal Structure with Trash Rack
Catwalk on New Canal
Structure

Completed Canal Structure
New Canal Structure

Completed Canal Structure
New Canal Structure

New Diversion Structure in Operation
New Diversion Structure
in Operation

New Diversion Structure in Operation
New Diversion Structure
in Operation

New Diversion Structure in Operation
New Diversion Structure
in Operation


Riprap Streambank Protection
Completed Riprap Lined
Streambank