Skip

Grove Creek Debris Basin Rehabilitation

Project Description

The Natural Resources Conservation Service (NRCS) is analyzing alternatives to rehabilitate Grove Creek Debris Basin located at the foothills within Pleasant Grove, Utah.  NRCS performed an assessment of Grove Creek Debris Basin in 2005.  The 2005 assessment concluded that the Grove Creek Debris Basin does not meet current NRCS and Utah State Dam Safety regulations and engineering standards for a high hazard dam (potential “Loss of Life”).  The purpose and need for this project is to meet current USDA-NRCS and Utah State Dam Safety regulations and current engineering standards, and to continue to provide current benefits for the authorized purposes of flood prevention and sediment retention.  The project would restore the design storage capacity in the reservoir by raising the water level, enlarging the spillway to pass the Probable Maximum Precipitation (PMP) event, and provide slope stability for seismic events.

NEPA Analysis

This project is being partially funded by the NRCS Small Watershed Rehabilitation Amendments (PL 106-472) which authorizes funding and technical assistance to rehabilitate aging flood control dams built under the Small Watershed Program (PL 83-566).  NRCS, as the lead federal agency, is initiating NEPA analysis in the form of a Supplemental Watershed Plan and Environmental Assessment to analyze impacts to the natural and human environment from this project.  The Environmental Assessment will comply with the Council on Environmental Quality’s regulations at 40 CFR Parts 1500-1508 which require an evaluation of potential environmental impacts associated with federal projects and actions.  This debris basin is controlled by the North Utah County Water Conservancy District which is the project sponsor.

Current Status

The NRCS has completed the Final Supplemental Watershed Plan-Environmental Assessment (Final Plan-EA) describing the proposed rehabilitation of the Grove Creek Debris Basin.  The Final Plan-EA presents the alternatives analyzed, potential impacts to the environment, and the Preferred Alternative for the project.  The NRCS Utah State Conservationist has decided that a Finding of No Significant Impact is approved for the Preferred Alternative (Dam Rehabilitation Alternative).

Draft Plan-EA

The public comment period is now closed.  The public was invited to comment on the Draft Plan-EA during the specified time period below and attend a Draft Plan-EA public open house

Draft Plan-EA Public Comment Period

Open:      Thursday, July 24, 2014
Close:      Friday, August 22, 2014

Draft Plan-EA Public Open House

Date:           Thursday, July 31, 2014
Time:           6:00 p.m. – 8:00 p.m. (MST)
Location:     Pleasant Grove Recreation Center
                    Multi-Purpose Room
                    547 South Locust Avenue
                   Pleasant Grove, Utah    

Electronic and hard copies of the Draft Plan-EA will be available for review from July 24 - August 22, 2014 at:

http://www.nrcs.usda.gov/wps/portal/nrcs/main/ut/programs/planning/wr

and

Pleasant Grove City Hall  -  70 S. 100 E., Pleasant Grove, UT
Pleasant Grove Library  -  30 E. Center, Pleasant Grove, UT

Contact Information

Norm Evenstad – NRCS
125 S. State Street – Room 4010
Salt Lake City, UT 84138-1100
801-524-4569
norm.evenstad@ut.usda.gov

Project Documents

Final Plan - EA

Grove Creek Final Plan EA Appendix A (PDF, 1.50 MB)
Grove Creek Final Plan EA Appendix B (PDF, 5.16 MB)
Grove Creek Final Plan EA Appendix C (PDF, 4.83 MB)
Grove Creek Final Plan EA Appendix D (PDF, 6.65 MB)
Grove Creek Final Plan EA Appendix E (PDF, 46.7 MB)
Grove Creek Final Plan EA Report (PDF, 1.71 MB)
Grove Creek Final Plan EA Total Report (PDF, 66.9 MB)
Grove Creek Final Plan EA Supplement (PDF, 1.33 MB)
Grove Creek Signed FONSI (PDF, 831 KB)

Draft Plan - EA

Grove Creek Draft Plan EA Total Report (PDF, 62.9 MB)
Grove Creek Draft Plan EA Report  (PDF, 1.69 MB)
Grove Creek Draft Plan EA Appendix A (PDF, 309 MB)
Grove Creek Draft Plan EA Appendix B (PDF, 5.33 MB)
Grove Creek Draft Plan EA Appendix C (PDF, 4.99 MB)
Grove Creek Draft Plan EA Appendix D (PDF, 6.69 MB)
Grove Creek Draft Plan EA Appendix E (PDF, 47 MB)

Scoping

Scoping Report (PDF, 3.42 MB)
Scoping Notice
(PDF, 202 KB)
Scoping Project
(PDF, 202 KB)
Scoping Public Meeting Presentation
(PDF, 202 KB)

 
Updated:  September 9, 2014