Skip

Cabin Branch Watershed Project

 

Storm Drain Channel near Hopkins, SC A section of Main 1 of Cabin Branch Watershed where one-sided construction was used to minimize environmental disturbance. Construction began on this project near the town of Hopkins in 1997. Five main channels and their laterals will provide flood relief to parts of the 11,200 acre watershed.