Skip

Design Tools for Emergency Watershed Protection Projects

This Web page provides tools for the design and documentation of Emergency Watershed Program projects.

Standard Drawings and Details

The following documents require Adobe Reader, Microsoft Word or Microsoft Excel.

All downloads are less than 125 KB in size, except where noted.

Design Tools for Emergency Watershed Protection Projects

Form Number

Design Spreadsheets

Download

n/a

Engineer Cost Estimate

.xls

n/a

New York Hydraulics

.xls (5.9 MB)

n/a

Rock Wall Stability

.xls

 

National Engineering Handbook, Part 658

 

neh pt. 654, ch. 13

Armor Layer

.xls

neh pt. 654, ch. 13

Equilibrium Slope

.xls

neh pt. 654, ch. 14

Root Wad Calculator

.xls

neh pt. 654, ch. 14

Stone Sizing

.xls

 

Conservation Practice Standards

 

nyps584

Channel Bed Stabilization

.pdf

nyps342

Critical Area Seeding

.pdf

nyps580

Streambank and Shoreline Protection

.pdf

n/a

Streambank and Shoreline Protection - Practice Introduction

.pdf

 

Construction Specifications

 

nrcs-cs-00

Bio-engineering

.pdf

n/a

Bio-engineering

.pdf

nrcs-cs-004

Channel Clearing and Shaping

.pdf

nrcs-cs-094

Contractor Quality Control

.pdf

nrcs-cs-023

Earthfill

.pdf

nrcs-cs-021

Excavation

.pdf

nrcs-cs-095

Geotextile

.pdf

nrcs-cs-008

Mobilization and Demobilization

.pdf

nrcs-cs-005

Pollution Control

.pdf

nrcs-cs-011

Removal of Water

.pdf

nrcs-cs-061

Rock Riprap

.pdf

nrcs-cs-006

Seeding, Sprigging, and Mulching

.pdf

nrcs-cs-435

Site Preparation, Grading and Shaping

.pdf

nrcs-cs-083

Timber Fabrication and Installation

.pdf

nrcs-cs-009

Traffic Control

.pdf

 

Material Specifications

 

nrcs-ms-592

Geotextile

.pdf

nrcs-ms-523

Rock for Riprap

.pdf

nrcs-ms-584

Structural Timber and Lumber

.pdf

 

Miscellaneous

 

n/a

EWP 2011 Engineer Estimate and Bid Schedule (example)

.xlsx

n/a

Hardened Riffle - Structure Specification

.pdf

n/a

Job Narrative (example) - includes Operation and Maintenance Plan

.doc

n/a

Operation and Maintenance Cost Estimator

.xlsx

n/a

Performance Time Estimate

.xls

n/a

Local Pre-construction Conference Checklist Template

.doc

n/a

Pre-construction Conference Checklist

.doc

n/a

Pre-design Meeting Checklist

.doc

nrcs-ads-045

Final Inspection and Certificate of Completion
(Form NRCS-ADS-045 and instructions for making entries)

.pdf

Program Manager

Peter Wright, State Conservation Engineer
Syracuse, New York
Telephone: 315-477-6538
E-mail: Peter Wright