Skip Navigation

EFT - Roadmap

The current release of EFT is version 4.0.1.6.
 
Email the support team at eftsupport@ftc.usda.gov.

Current Design Manager (Tools) List

This is the current list of EFT design managers, along with their status.
Many more design managers will be added to the list as time goes on.

  • EFT Framework (v3.0 released)
  • SET - Survey Engineering Tool (v3.0 released)
  • Structures - included as part of SET (v3.0 released)
  • WDT - Waterway Development Tool (v3.0 released)
  • TDT - Terrace Design Tool (v3.0 released)
  • PDT - Pipeline Design Tool (development underway)

Proposed Future Design Manager (Tools) List

EFT design managers proposed for future development include:

  • AWMT - Animal Waste Management Tool
  • FPDTF - Farm Pond Design Tool
  • IWMT - Irrigation Water Management tool

Project Milestones

Builds are normally scheduled weekly, on either Thursday evening or Friday morning.

Milestones Starting Date Ending Date
WDT Release to Production (v2.0.1.5) February, 2008 November, 2008
SET Structures Development February, 2008 September, 2008
SET Structures Release to Production September, 2008 April, 2009
TDT Design/Development February, 2009 December 31, 2010
TDT Release to Production May, 2011  
PDT Design/Development January 1, 2011  
PDT Release to Production