Skip

Technical Guide: Construction Specifications

TABLE OF CONTENTS

The following documents require Adobe Acrobat (.pdf) 

CODE PRACTICE NAME  DATE Word
Document
PDF 
Format
403 Structure Removal June 2004 X X
404 Channel Clearing and Shaping June 2004 X X
405 Pollution Control March 2011 X X
406 Seeding and Mulching May 2009 X X
407 Construction Surveys May 2009 X X
408 Mobilization and Demobilization June 2004 X X
411 Removal of Water March 2011 X X
421 Excavation June 2004 X X
423 Earth Fill and Gravel Fill March 2011 X X
432 Structure Concrete and Steel Reinforcement March 2011 X X
442 Concrete Pipe Conduits May 2009 X X
444 Subsurface Drainage March 2011 X X
451 Corrugated Metal Pipe Conduits May 2009 X X
461 Rock Riprap May 2009 X X
462 Grouting Rock Riprap May 2009 X X
464 Wire Mesh Gabions and Mattresses May 2009 X X
465 Soil Bioengineering Plantings May 2009 X X
481 Metal Fabrication and Installation March 2011 X X
483 Timber Fabricated and Installation May 2009 X X
494 Contractor Quality Control May 2009 X X
495 Geotextile June 2004 X X

For more information contact Dan Baumert, State Conservation Engineer, at 207-990-9100 ext. 3, or email dan.baumert@me.usda.gov.