Using American Investment and Recovery Act Funding under the authority contained in Section 14 of the Watershed Protection and Flood Prevention Act, Georgia NRCS, has recently completed rehabilitation of four aging watershed dams located in Barrow, Madison and Jackson Counties. This work was completed in partnership with the Georgia Soil and Water Conservation Commission, the Broad River Soil and Water Conservation District, the Oconee River Soil and Water Conservation District, Barrow County, Jackson County and Madison County. 

Rehabilitation of these dams was needed to address critical public health and safety issues in these communities as the dams are nearing the end of their 50-year design life and did not meet current dam safety criteria.

The final inspection  of the completed work was completed on Marbury Creek 22 on March 3, Little Sandy Trail Creek 1, was on May 23, Sandy Creek 15 on August 3,  and South River 4 on August 22, 2011. Final project closeout was completed in April 2012, after vegetation was reestablished at each site. Operation and maintain was returned to the sponsors at that time.

The purpose of the final inspection is to insure that the dams are completed within specifications and all work has been completed per the contract.  The final inspection is the last step of the construction process.  Once vegetation is established at the sites, the local sponsors will once again assume responsibility for the operation and maintenance of the structures.

The pictures below shows the dams during the final inspection. Click on each picture for a larger picture.

Marbury Creek 22   Little Sandy Trail Creek 1   Sandy Creek 15   South River 4

1

Looking at the front slope of Marbury Creek 22.
  Looking at the front slope.   5
Inspectors review specifications at Little Sandy Creek 1.
 

Inspectors review specifications at dam site.

  9
Sandy Creek 15 looking down from the hill side at the labyrinth design.
  Sandy Creek 15 looking down from the hill side at the labyrinth design.   13
Looking into the labyrinth at South River 4.
  Looking into the labyrinth at South River 4.                   
                             
2
Looking at the back slope of Marbury Creek 22.
  Looking at the back slope.
 
  6
Inspectors walking around the side of the auxiliary spillway at Little Sandy Creek 1.
  Inspectors walking around the side of the auxiliary spillway.
 
  10
Above the labyrinth looking out at the lake.
  Above the labyrinth looking out at the lake.   14
The auxiliary spillway looking down to the spill pool.
  The auxiliary spillway looking down to the spill pool.
                             
3
Looking at the auxiliary spillway of Marbury Creek 22.
  Looking at the auxiliary spillway.

 

  7
Looking back toward the lake from in the wider auxiliary spillway at Little Sandy Creek 1.
  Looking back toward the lake from in the wider auxiliary spillway.   11
Sandy Creek 15 spillway looking out toward the spill pool and creek.
  Sandy Creek 15 spillway looking out toward the spill pool and creek.   15
Inspectors look over the front slope area of South River 4.
  Inspectors look over the front slope area of South River 4.
                             
4
The grass area is where fill was taken from for the dams slopes.
  The grass area is where fill was taken from for the dams slopes.

 
  8
Assistant State Conservationist for Programs, Jimmy Bramblett takes with Georgia State Financing and Investment Commission, Senior Civil Engineer, Gerard Mastrella.
   Assistant State Conservationist for Programs, Jimmy Bramblett takes with Georgia State Financing and Investment Commission, Senior Civil Engineer, Gerard Mastrella.   12
Inspectors look over the front slope area of Sandy Creek 15.
  Inspectors look over the front slope area of Sandy Creek 15.   16
South River 4 spillway dumping into the spill pool.
  South River 4 spillway dumping into the spill pool.